PHOTOS DES EIS-ACCES DU POINT 3.3 (TEL QUE CONSTRUIT 01-2010)



SD-PM-US (SURFACE, ESCALIERS PUITS)

YCA01=PZ33

YCA01=PZ33

YCA01=PZ33

YCPZ01=SZ33

YCPZ01=SZ33

YCPC01=SZ33

YCPS01=PZ33

YCPS01=PZ33

YCPS01=US33

YCPS01=US33

YJBD01=US33

 

UJ (GALERIE PRINCIPALE, SOUTERRAIN)

 

YCPS01=UJ33

YCPS01=UJ33

YCPV01=UP33

YCPV01=UP33

YZBPB01=UJ33

YZBPB01=UJ33


R (TUNNEL PRINCIPAL, SOUTERRAIN)

YCPS01=R34

YCPS01=R37

YCPS01=R37

YCPV01=UJ32


ARMOIRES DE CONTROLE SD, SR, UJ(SURFACE, SOUTERRAIN)

YYACS01...04=SZ33

YYACS01...03=UJ33

YYACS01=RE38


Last update 17-11-2010 by sdl